Metro approves I-10 Inner Katy BRT route

Big step forward.

Metro officials Thursday settled on the route for a busway along Interstate 10 that they predict will improve transit for urban and suburban travelers, whether they hop on board or not.

The elevated busway planned along the southern side of I-10 between Uptown and downtown will allow park and ride buses and bus rapid transit to avoid freeway traffic between the Northwest Transit Center near Loop 610 and I-10 and Houston’s central business district. Metropolitan Transit Authority board members approved the route Thursday, keeping the $400 million-plus project on pace for construction starting late next year and buses speeding along it by 2027.

“It takes us a long way in my judgment to having a rapid transportation system that Houston can depend on as it grows in the 21st century,” Metro board member Jim Robinson said.

As part of Metro’s long-range plan, approved by voters in 2019, the agency expects to build 75 miles of of bus rapid transit — large buses that operate similar to rail, using a separated lane to bypass traffic and stop at stations. Though a major component of the region’s transit plan, the first BRT line in Houston, the Silver Line along Post Oak through Uptown, so far has struggled to attract riders as park and ride service to Uptown and office occupancy in Uptown have been affected by the COVID pandemic.

By 2045, officials expect about 30,000 commuter bus riders and 12,000 rapid transit riders to use the busway daily. A trip from the Northwest Transit Center to downtown would take 19 minutes — less than many peak-time commutes by car or truck take now.

[…]

In addition to setting the route, the plan approved Thursday calls for three new stations along I-10 at Memorial Park, Shepherd-Durham and Studemont. Those stations line up with anticipated demand from nearby neighborhoods and expected improvements to major bus routes as part of the agency’s long-range transit plan, said Amma Cobbinah, a Metro senior transit planner overseeing the project.

Within the central business district, the BRT vehicles will use the existing light rail platforms along Capitol and Rusk. Two other stations, at St. Emmanuel and Franklin at Bagby, will be built for the buses.

Metro spokesman Jerome Gray said officials have not decided if the BRT along I-10 will be an extension of Silver Line service, or a separate line.

Still unresolved, however, is how buses will transition from the elevated busway along I-10 to Franklin and Bagby. Metro’s preference is to use the existing high occupancy toll lane connector into downtown, but the future of that link is in jeopardy because of the Texas Department of Transportation’s plan to rebuild Interstate 45 near and around downtown.

There are some more details in the preview story, which ran on Thursday morning before the Metro board meeting, including the “recommended alignment” document and an embed of this video, which shows the proposed route; there is one option in there, which depends on the existing HOT lanes that may be taken out by the I-45 project.

I’ve discussed this project, which was part of the 2019 Metro Next plan, a couple of times. The idea of a Memorial Park stop has come up before, and I think having it in this project makes a lot of sense. And though the Chron story doesn’t mention it, this Inner Katy route has been an implicit part of the plan to have the Texas Central terminal at or near the Northwest Transit Terminal.

As someone who lives about a mile from the future Studewood station, I very much approve of this plan. I will note that to really make this effective, some work will need to be done on the sidewalks on Studemont/Studewood, both north from I-10 into the Heights and south towards Washington Avenue. There are a couple of large residential properties being built on the west side of Studemont, plus whatever is to come on the old Party Boy site, and this station will be close to an entry point to the White Oak bike trail, for further connectivity and easy access to the Sawyer Heights developments, which includes another large new apartment building. The potential is very much there for a lot of people to use this, if it’s easy and safe to walk or bike to it. I’ll never drive to the Galleria again if they do this right. Construction is set to start later this year, and I’ll be looking forward to seeing it all take shape.

Related Posts:

This entry was posted in Planes, Trains, and Automobiles and tagged , , , , , , , , , , , , , , . Bookmark the permalink.