Metro working on sidewalks

I heartily approve of this.

Metropolitan Transit Authority is taking the lead on leveling sidewalks and bus stops to give riders an easier path to transit — or, in some cases, actual access to it.

“This is a model of what an agency can do,” said Metro board member and disability access advocate Lex Frieden.

Noting will happen overnight to make each of Metro’s 9,000 stops smooth and ready for wheelchairs, but the effort and the money Metro is putting behind it — some of its own and the rest coming from city, county, regional and state sources — is unprecedented.

“This is not just rhetoric, we are funding this priority,” said Roberto Trevino, Metro’s executive vice president for planning, engineering and construction.

Transit officials last year committed to tackling these treacherous trips, noting the deplorable condition of some sidewalks and bus stops in the region.

In many communities, transit users — especially the elderly and those in wheelchairs — are cut off from buses because they cannot make it to the stops because of blocked, buckled or absent sidewalks. When they can get to a stop, they wait exposed to the sun and rain, at places where bus ramps cannot quite line up with the sidewalk, if there even is a sidewalk.

“Some of them are just standing in the grass,” Metro board member Lisa Castaneda said.

Metro jump-started a handful of projects last year to repair sidewalks in key spots, as they assessed which of the system’s bus stops — including those at transit centers — were most in need of fixing.

On Thursday, officials are scheduled to approve a contract with Tikon Group for on-call construction services aimed at bus stops. The on-call contract will give staff the ability to hire Tikon for up to $3.2 million worth of work over the next three years.

Repairs at each stop will vary in price, but officials said the contract likely will lead to repairs at hundreds of bus stops.

[…]

Another $30 million in funding could follow, pending approval from the Houston-Galveston Area Council. The agency’s transportation policy council, which doles out federal money, is finalizing its list of upcoming projects. Staff have suggested giving Metro $30 million for key sidewalk and accessibility projects.

Addressing the problems, however, extends beyond Metro. Within Houston, the city has some oversight of sidewalks but cedes most of the responsibility to landowners, who are supposed to maintain pedestrian access along the property. The city lacks the power in many cases to force improvements, leaving many sidewalks in disrepair, especially in older parts of the city.

Harris County leaders have expressed interest in working with Metro to make some larger improvements, said Metro board member Jim Robinson, the county’s appointee to the transit authority.

I’ve been all in on improving sidewalks for some time now, so this is all music to my ears. I’m especially glad to see H-GAC and Harris County getting into the game. It can’t be said enough: Better sidewalks make for a better transit experience, which will mean more riders. It’s also vital for riders with mobility issues. Everything about this story makes me happy.

Related Posts:

This entry was posted in Planes, Trains, and Automobiles and tagged , , , , , , , , . Bookmark the permalink.

One Response to Metro working on sidewalks

  1. Jack Valinski says:

    There are many problems with sidewalks in Houston. But when construction can close a sidewalk for more than two years in the urban core and there is no city code against it, we have a problem. Downtown Allen Center has sidewalks closed for many months. The Whole Foods on Elgin from more than two years sidewalks closed, at one point the sidewalk was closed across the street and a sign pointed to use sidewalk on other side, which was closed. At McGown METRO station sidewalks closed for more than two years, at one point both sides were closed. In many cities construction projects require a wooden covered sidewalk for construction.

Comments are closed.